Speed Signal Circuit
ComponentsInspection
INSPECTION
PROCEDURE
1. INSPECT FRONT NO. 1 SUSPENSION LOWER ARM SUB-ASSEMBLY LH
(a) As shown in the illustration, flip the ball joint stud back and forth
5 times before installing the nut.
(b) Using ...
Light Control Rheostat
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT LIGHT CONTROL RHEOSTAT (w/o TAIL Cancel Switch)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Conn ...