COMPONENTS
ILLUSTRATION
On-vehicle InspectionInstallation
INSTALLATION
PROCEDURE
1. INSTALL COOLER DRYER
(a) Using pliers, install the cooler dryer.
(b) Apply a sufficient amount of compressor oil to the contact surfaces
of a new O-ring and the cap.
Compressor oil:
ND-OIL 8 or equivalent
...
Operation Check
OPERATION CHECK
1. CHECK AUTOMATIC RUNNING BOARD OPERATION
(a) When side auto step switch assembly is "AUTO", the operation and condition
of this control are described below.
Check that the driver side automatic running board operates as follows ...