When trouble arises
Emergency flashersInstallation
INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(a) Remove any dust and oil from the differential carrier assembly and the contact
surfaces of the axle housing.
(b) Install a new gasket and the differential carrier assembly with the ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL LOWER BALL JOINT DUST COVER LH
(a) Pack the lower arm ball joint with MP grease.
Grease capacity:
8.0 g (0.282 oz.)
(b) Apply MP grease to the locations shown in the illustration.
Text in Illustration
...