Terminals Of Ecu
Parts LocationInitialization
INITIALIZATION
1. PROCEDURES NECESSARY WHEN CABLE IS DISCONNECTED/RECONNECTED TO BATTERY TERMINAL
Procedures Necessary when Cable is Disconnected/Reconnected to Battery Terminal
Necessary Procedure
Effect or Inoperative Function when N ...
Inspection
INSPECTION
PROCEDURE
1. CHECK PAD LINING THICKNESS
(a) Using a ruler, measure the pad lining thickness.
Standard thickness:
10.0 mm (0.394 in.)
Minimum thickness:
1.0 mm (0.0394 in.)
If the pad lining thickness is less than the m ...