INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(a) Install a new gasket and the differential carrier assembly with the 10 nuts and 10 washers.
Torque:
52 N·m {530 kgf·cm, 38 ft·lbf}
2. INSTALL REAR AXLE SHAFT LH
(a) Install the rear axle shaft LH (See page
).
3. INSTALL REAR AXLE SHAFT RH
HINT:
Use the same procedure described for the LH side.
4. INSTALL PROPELLER SHAFT ASSEMBLY
(a) Install the propeller shaft assembly (See page
).
ReassemblyInspection
INSPECTION
PROCEDURE
1. INSPECT TRANSMISSION CONTROL SWITCH
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
...
If the vehicle battery is discharged
The following procedures may be used to start the engine if the vehicle's
battery is discharged.
You can also call your Toyota dealer or a qualified repair shop.
If you have a set of jumper (or booster) cables and a second vehicle with a
12-volt batt ...