Clearance Warning Ecu
PrecautionAdjustment
ADJUSTMENT
PROCEDURE
1. VEHICLE PREPARATION FOR FOG LIGHT AIM ADJUSTMENT
(a) Prepare the vehicle:
Make sure that the vehicle has no damage or deformation around the headlights.
Fill the fuel tank.
Make sure that all of the different types ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Install the front No. 3 differential support with the 2 bolts.
Torque:
108 N·m {1101 kgf·cm, 80 ft·lbf}
(b) Install the front No. 2 differential support with the 2 bolts.
Torq ...