Speed Signal Circuit
Inner Rear View MirrorInstallation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Install the front No. 3 differential support with the 2 bolts.
Torque:
108 N·m {1101 kgf·cm, 80 ft·lbf}
(b) Install the front No. 2 differential support with the 2 bolts.
Torq ...
Road Test
ROAD TEST
1. PROBLEM SYMPTOM CONFIRMATION
(a) Based on the result of the customer problem analysis, try to reproduce the
symptoms. If the problem is that the transmission does not shift up or shift down,
or that the shift point is too high or too low, co ...