Type A

Type B and C

Operating a USB memory
Using the audio control functionInstallation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
A bolt without a torque specification is shown in the standard bolt chart (See
page ).
PROCEDURE
1. INSTALL PINTLE HOOK SUPPORT TUBE SUB-ASSEMBLY (w/ Pintle Hook)
(a) Install the pintle hook support tube sub- ...
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT GARAGE DOOR OPENER
(a) Press each switch and check that the red LED turns on. If one or
more of the switches does not turn on the LED, confirm normal operation
of the fuse and wire harness. If th ...