Toyota 4Runner manuals

Toyota 4Runner: Propeller Shaft Assembly(for 4wd)

Installation
INSTALLATION PROCEDURE 1. INSTALL PROPELLER SHAFT ASSEMBLY (a) Remove SST from the extension housing. SST: 09325-40010 (b) Install the propeller shaft assembly to the extension housing. (c) Alig ...

Components
COMPONENTS ILLUSTRATION ...

Other materials about Toyota 4Runner:

Installation
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator bracket to the generator with the bolt. Torque: 20 N·m {204 kgf·cm, 15 ft·lbf} (b) Install the generator with the 2 bolts. Torque: 43 N·m {438 kgf·cm, 32 ft·lbf} (c ...

Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). 2. REMOVE UPPER RADIATOR SUPPORT SEAL 3. REMOVE FRONT FENDER MAI ...

© 2016-2026 | www.to4runner.net

0.007