Installation
ComponentsReassembly
REASSEMBLY
PROCEDURE
1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH
(a) Pack the upper arm ball joint with MP grease.
Grease capacity:
8.0 g (0.282 oz.)
Text in Illustration
*1
MP Grease
...
Speed Signal Circuit
DESCRIPTION
The vehicle speed signal consists of pulses sent to the side auto step controller
ECU assembly from the main body ECU (multiplex network body ECU).
WIRING DIAGRAM
PROCEDURE
1.
INSPECT MAIN BODY ECU (MULTIPLEX NETWORK ...