INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump with the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(b) Install the wire harness bracket with the bolt.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
2. CONNECT NO. 1 PRESSURE FEED TUBE
(a) Install a new gasket to the pressure feed tube.
(b) Connect the pressure feed tube and install the union bolt.
Torque:
50 N·m {510 kgf·cm, 37 ft·lbf}
3. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
(a) Connect the No. 1 oil reservoir to pump hose to the vane pump assembly with the clip.
4. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR
(a) Connect the 2 connectors.
5. INSTALL FAN AND GENERATOR V BELT
6. INSTALL AIR CLEANER CASE
7. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
8. INSTALL AIR CLEANER CAP AND HOSE
9. INSTALL V-BANK COVER SUB-ASSEMBLY
10. INSTALL FRONT FENDER APRON SEAL RH
11. INSTALL FRONT WHEEL RH
Torque:
for aluminum wheel :
103 N·m {1050 kgf·cm, 76 ft·lbf}
for steel wheel :
112 N·m {1142 kgf·cm, 83 ft·lbf}
12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
13. ADD POWER STEERING FLUID
14. BLEED AIR FROM POWER STEERING FLUID
(a) Bleed air from the power steering fluid (See page
).
15. INSPECT FOR POWER STEERING FLUID LEAK
Illumination Circuit
DESCRIPTION
Power is supplied to the radio and display receiver assembly and steering pad
switch illumination when the light control switch is in the tail or head position.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
Inspect the fuses for c ...
Disassembly
DISASSEMBLY
PROCEDURE
1. REMOVE REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING
HINT:
Use the same procedure for all rear propeller shaft universal joint spider bearing.
(a) Place matchmarks on the flange yoke and propeller shaft.
Text i ...