Toyota 4Runner manuals

Toyota 4Runner: Steering Column

Installation
INSTALLATION PROCEDURE 1. INSTALL VANE PUMP ASSEMBLY (a) Install the vane pump with the 2 bolts. Torque: 43 N·m {438 kgf·cm, 32 ft·lbf} (b) Install the wire harness bracket with the bolt. T ...

Steering Column Assembly
...

Other materials about Toyota 4Runner:

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR DRIVE END FRAME BEARING (a) Using SST and a press, press in a new generator drive end frame bearing. SST: 09950-60010 09951-00470 SST: 09950-70010 09951-07100 ...

Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). 2. REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY 3. REMOVE REA ...

© 2016-2021 | www.to4runner.net

0.0054