Toyota 4Runner manuals

Toyota 4Runner: Installation

INSTALLATION

CAUTION / NOTICE / HINT

HINT:

  • Use the same procedure for the RH and LH sides.
  • The procedure listed below is for the LH side.
  • A bolt without a torque specification is shown in the standard bolt chart (See page ).

PROCEDURE

1. TEMPORARILY INSTALL FRONT SUSPENSION UPPER ARM ASSEMBLY LH

(a) Temporarily install the suspension upper arm and 2 washers with the bolt and nut.

HINT:

After stabilizing the suspension, tighten the nut.


(b) Connect the bracket with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

(c) Install a new nut and clip.

Torque:

110 N·m {1122 kgf·cm, 81 ft·lbf}


2. INSTALL SKID CONTROL SENSOR WIRE


3. INSTALL FRONT WHEEL

Torque:

for aluminum wheel :

103 N·m {1050 kgf·cm, 76 ft·lbf}

for steel wheel :

112 N·m {1142 kgf·cm, 83 ft·lbf}

4. STABILIZE SUSPENSION


5. TIGHTEN FRONT SUSPENSION UPPER ARM ASSEMBLY LH

(a) Tighten the nut.

Torque:

115 N·m {1173 kgf·cm, 85 ft·lbf}


6. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

(a) Inspect and adjust the front wheel alignment (See page ).


Reassembly
REASSEMBLY PROCEDURE 1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH (a) Pack the upper arm ball joint with MP grease. Grease capacity: 8.0 g (0.282 oz.) Text in Illustration ...

Rear Suspension
...

Other materials about Toyota 4Runner:

Components
COMPONENTS ILLUSTRATION ILLUSTRATION ILLUSTRATION ILLUSTRATION ILLUSTRATION ...

General maintenance
Listed below are the general maintenance items that should be performed at the intervals specified in the “Owner's Warranty Information Booklet” or “Owner’s Manual Supplement/Scheduled Maintenance Guide”. It is recommended that any problem ...

© 2016-2024 | www.to4runner.net

0.0101