INSTALLATION
PROCEDURE
1. INSTALL HOOD LOCK ASSEMBLY
(a) Apply MP grease to the sliding areas of the hood lock assembly.
(b) Connect the hood lock control cable assembly.
(c) Connect the connector.
(d) Install the hood lock assembly with the 3 bolts in the order shown in the illustration. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} |
|
2. INSTALL HOOD LOCK CONTROL CABLE COVER
(a) Pass the hood lock control cable assembly through the hood lock control cable cover. |
|
(b) Attach the claw to install the hood lock control cable cover.
(c) Install the 2 screws in the order shown in the illustration.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
3. INSTALL LOW PITCHED HORN ASSEMBLY
4. INSTALL RADIATOR GRILLE BRACKET
5. INSTALL HIGH PITCHED HORN ASSEMBLY
6. INSTALL FRONT BUMPER COVER (w/ Intuitive Parking Assist System)
(See page )
7. INSTALL FRONT BUMPER COVER (w/o Intuitive Parking Assist System)
(See page )
Antenna Coil Open / Short (B2784)
DESCRIPTION
This DTC is stored when there is an open or short malfunction in the transponder
key amplifier coil (built into the engine switch).
DTC Code
DTC Detection Condition
Trouble Area
B2784
...
Torque Converter Clutch Pressure Control Solenoid Control Circuit Electrical
(Shift Solenoid Valve SLU) (P2759)
DESCRIPTION
The amount of current flow to the solenoid is controlled by the duty ratio* of
the ECM output signal. During the lock-up operation, if the duty ratio increases,
the lock-up hydraulic pressure increases.
HINT:
*: The duty ratio is the ratio ...