INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(a) Install a new gasket and the differential carrier assembly with the 10 nuts and 10 washers.
Torque:
52 N·m {530 kgf·cm, 38 ft·lbf}
2. INSTALL REAR AXLE SHAFT LH
(a) Install the rear axle shaft LH (See page
).
3. INSTALL REAR AXLE SHAFT RH
HINT:
Use the same procedure described for the LH side.
4. INSTALL PROPELLER SHAFT ASSEMBLY
(a) Install the propeller shaft assembly (See page
).
Relay
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. CHECK STOP LIGHT CONTROL RELAY
(a) Remove the stop light control relay from the engine room relay block.
(b) Measure the resistance according to the value(s) in the table below.
Stan ...
Installation
INSTALLATION
CAUTION / NOTICE / HINT
CAUTION:
Wear protective gloves. Sharp areas on the parts may injure your hands.
PROCEDURE
1. INSTALL REAR NO. 1 SEAT OUTER BELT ASSEMBLY RH
NOTICE:
When installing the retractor, make sure the claws of the vehicle ...