INSTALLATION
PROCEDURE
1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(a) Align the matchmarks on the yoke and differential flange.
(b) Install the propeller shaft assembly with the 4 washers, 4 bolts and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
(c) Align the matchmarks on the yoke and transfer flange.
(d) Install the propeller shaft assembly with the 4 washers and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
2. INSTALL FRONT EXHAUST PIPE
(a) Install the front exhaust pipe (See page
).
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT VEHICLE HEIGHT
NOTICE:
Perform the calibration on a level surface.
Perform the calibration with the vehicle empty.
Make sure that the wheels are on the ground and facing straight ahead.
Perf ...
No Response from ID BOX (B2789)
DESCRIPTION
This DTC is stored when LIN communication between the certification ECU and ID
code box stops for 10 seconds or more.
DTC Code
DTC Detection Condition
Trouble Area
B2789
No communicat ...