Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Install the front No. 3 differential support with the 2 bolts.
Torque:
108 N·m {1101 kgf·cm, 80 ft·lbf}
(b) Install the front No. 2 differential support with the 2 bolts.
Torq ...
Moon roof
Use the overhead switches to open and close the moon roof and tilt it up
and down.
Opening and closing
1. Opens the moon roof* The moon roof stops slightly before the fully open
position to reduce wind noise.
Press the switch again to fully open the m ...