CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
2. |
INSPECT BATTERY VOLTAGE |
Standard voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding.
|
3. |
CRANK ENGINE FOR MORE THAN 10 SECONDS |
|
4. |
CHECK FOR DTC* |
(a) Check for DTCs and note any codes that are output (See page
).
(b) Clear the DTCs (See page ).
(c) Recheck for DTCs. Try to duplicate the DTC (SFI system and engine immobiliser system) by reproducing the symptoms indicated by the DTC.
Result |
Proceed to |
---|---|
DTC is not output |
A |
SFI system DTC is output |
B |
Engine immobiliser system DTC is output |
C |
B | ![]() |
GO TO SFI SYSTEM |
C | ![]() |
GO TO DIAGNOSTIC TROUBLE CODE CHART |
|
5. |
PROBLEM SYMPTOMS TABLE |
(a) Refer to Problem Symptoms Table (See page
).
Result |
Proceed to |
---|---|
Fault is not listed in problem symptoms table |
A |
Fault is listed in problem symptoms table |
B |
B | ![]() |
GO TO STEP 7 |
|
6. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Data List / Active Test (See page ).
(b) Terminals of ECU (See page ).
|
7. |
ADJUST, REPAIR OR REPLACE |
|
8. |
CONFIRMATION TEST |
NEXT | ![]() |
END |
Data List / Active Test
DATA LIST / ACTIVE TEST
1. READ DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very usefu ...
Inverter Main Switch
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL MAIN SWITCH ASSEMBLY
(a) Attach the 2 claws to install the main switch.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
3. INSTALL COWL SIDE TRIM BO ...