Toyota 4Runner manuals

Toyota 4Runner: Installation

INSTALLATION

PROCEDURE

1. INSTALL REFRESHING SEAT SWITCH

(a) Attach the 4 claws to install the refreshing seat switch.

2. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


3. INSTALL NO. 2 CONSOLE BOX RETAINER


4. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY


5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)


7. INSTALL HEATER CONTROL ASSEMBLY


8. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


9. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).


Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

11. CHECK SRS WARNING LIGHT

(See page )


Inspection
INSPECTION PROCEDURE 1. INSPECT REFRESHING SEAT SWITCH Text in Illustration *a Component without harness connected (Refreshing Seat Switch) *b Blowe ...

Climate Control Seat System
...

Other materials about Toyota 4Runner:

Installation
INSTALLATION PROCEDURE 1. INSTALL POWER OUTLET SOCKET COVER (a) Attach the 2 claws to install the socket cover. 2. INSTALL POWER OUTLET SOCKET ASSEMBLY (a) Attach the claw to install the power outlet socket assembly. 3. INSTALL LOWER CENTER INSTRUMENT CL ...

Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system (See page ). NOTICE: When disconnecting the cable, s ...

© 2016-2026 | www.to4runner.net

0.0105