Toyota 4Runner manuals

Toyota 4Runner: Networking

Installation
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator bracket to the generator with the bolt. Torque: 20 N·m {204 kgf·cm, 15 ft·lbf} (b) Install the generator with t ...

Can Communication System
...

Other materials about Toyota 4Runner:

Inspection
INSPECTION PROCEDURE 1. INSPECT TIE ROD END SUB-ASSEMBLY (a) Install the nut. (b) Flip the ball joint stud back and forth 5 times as shown in the illustration. (c) Using a torque wrench, turn the nut co ...

Disassembly
DISASSEMBLY PROCEDURE 1. REMOVE RADIATOR GRILLE 2. REMOVE NO. 2 ENGINE ROOM WIRE (a) Disconnect each connector. (b) Detach the 9 clamps to remove the No. 2 engine room wire. 3. REMOVE NO. 1 ULTRASONIC SENSOR 4. REMOVE ULTRASONIC SENSOR CLIP ...

© 2016-2024 | www.to4runner.net

0.0069