Installation
INSTALLATION
PROCEDURE
1. INSTALL COOLER DRYER
(a) Using pliers, install the cooler dryer.
(b) Apply a sufficient amount of compressor oil to the contact surfaces
of a new O-ring and the cap.
Compressor oil:
ND-OIL 8 or equivalent
...
Terminals Of Ecu
TERMINALS OF ECU
1. CHECK SLIDING ROOF DRIVE GEAR SUB-ASSEMBLY (SLIDING ROOF ECU)
(a) Disconnect the S10 sliding roof drive gear sub-assembly connector.
(b) Measure the resistance and voltage according to the value(s) in the table
below.
HINT:
Measure ...