DISPOSAL
PROCEDURE
1. DISPOSE OF CENTER CONTROL ABSORBER ASSEMBLY LH
(a) Using a drill, make a hole in the cylinder as shown in the illustration to discharge the gas inside. |
|
(b) Remove the flare nut.
(c) Drain suspension fluid.
System Diagram
SYSTEM DIAGRAM
Communication Table
Sender
Receiver
Signal
Line
ECM
Skid control ECU
Engine speed signal
Accelerator pedal position signal
Intak ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH
(a) Pack the upper arm ball joint with MP grease.
Grease capacity:
8.0 g (0.282 oz.)
Text in Illustration
*1
MP Grease
...