CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
2. |
INSPECT BATTERY VOLTAGE |
Standard voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding.
|
3. |
CHECK COMMUNICATION FUNCTION OF CAN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the CAN communication system is functioning normally.
Result |
Proceed to |
---|---|
CAN DTC is not output |
A |
CAN DTC is output |
B |
B |
GO TO CAN COMMUNICATION SYSTEM |
|
4. |
CHECK COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the LIN communication system is functioning normally.
Result |
Proceed to |
---|---|
LIN DTC is not output |
A |
LIN DTC is output |
B |
B |
GO TO LIN COMMUNICATION SYSTEM |
|
5. |
CHECK FOR DTC* |
(a) Check for DTCs. Based on the DTCs output, try to cause the same steering lock system DTC, engine immobiliser system DTC or smart key system (for Entry Function) DTC to be stored by reproducing the symptoms indicated by the DTC.
Result |
Proceed to |
---|---|
DTC is not output |
A |
Steering lock system DTC is output |
B |
Engine immobiliser system DTC is output |
C |
Smart key system (for Entry Function) DTC is output |
D |
B |
GO TO STEERING LOCK SYSTEM |
C |
GO TO ENGINE IMMOBILISER SYSTEM |
D |
GO TO DIAGNOSTIC TROUBLE CODE CHART |
|
6. |
PROBLEM SYMPTOMS TABLE |
(a) Refer to the Problem Symptoms Table (See page ).
Result |
Proceed to |
---|---|
Fault is not listed in problem symptoms table |
A |
Fault is listed in problem symptoms table |
B |
B |
GO TO STEP 8 |
|
7. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Operation Check (See page ).
(b) Data List / Active Test (See page ).
(c) Terminals of ECU (See page ).
|
8. |
REPAIR OR REPLACEMENT |
|
9. |
CONFIRMATION TEST |
NEXT |
END |
Panel Switches do not Function
CAUTION / NOTICE / HINT
NOTICE:
After replacing the navigation receiver assembly of vehicles subscribed to pay-type
satellite radio broadcasts, registration of the XM radio ID is necessary.
PROCEDURE
1.
CHECK PANEL SWITCH
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR STABILIZER LINK ASSEMBLY
(a) Install the rear stabilizer link assembly with the bolt and nut.
Torque:
100 N·m {1020 kgf·cm, 74 ft·lbf}
HINT:
Turn the nut while holding the bolt.
2. INSTALL REAR STABILIZER CONT ...