INSPECTION
PROCEDURE
1. INSPECT TIE ROD END SUB-ASSEMBLY
|
(a) Install the nut. |
|
(b) Flip the ball joint stud back and forth 5 times as shown in the illustration.
(c) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and check the torque reading on the 5th turn.
Standard Torque:
1.0 to 3.9 N*m (10 to 39 kgf*cm, 9 to 34 in.*lbf)
2. INSPECT TOTAL PRELOAD
|
(a) Place matchmarks as shown in the illustration. Text in Illustration
|
|
(b) Temporarily install the 2 steering rack ends to the steering rack.
NOTICE:
Do not fully turn the steering rack without the steering rack ends installed as it may damage the oil seal in the rack housing.
|
(c) Using SST, fully turn the steering rack right and left 10 times to settle it. SST: 09616-00011 |
|
|
(d) Using SST, turn the control valve and measure the preload. SST: 09616-00011 Standard preload (turning): 1.6 to 2.3 N*m (16 to 23 kgf*cm, 14 to 20 in.*lbf) If the turning torque is not as specified, replace the steering gear assembly. HINT:
|
|
(e) After inspecting the preload, align the matchmarks.
Disassembly
ReassemblyProblem Symptoms Table
PROBLEM SYMPTOMS TABLE
HINT:
Use the table below to help determine the cause of problem symptoms.
If multiple suspected areas are listed, the potential causes of the symptoms
are listed in order of probability in the "Suspected Area" ...
Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
A bolt without a torque specification is shown in the standard bolt
chart (See page ).
PROC ...