INSTALLATION
PROCEDURE
1. INSTALL STEERING WHEEL ASSEMBLY
(a) Align the matchmarks on the steering wheel assembly and steering main shaft assembly.
(b) Install the steering wheel assembly set nut.
Torque:
50 N·m {510 kgf·cm, 37 ft·lbf}
2. INSTALL CRUISE CONTROL MAIN SWITCH
3. INSTALL STEERING PAD SWITCH ASSEMBLY
(a) Attach the 2 claws and 4 guides to install the steering pad switch assembly.
(b) Install the 4 screws.
Torque:
2.4 N·m {24 kgf·cm, 21 in·lbf}
(c) Connect the connector.
4. INSTALL STEERING PAD
5. INSTALL NO. 2 STEERING WHEEL LOWER COVER
6. INSTALL NO. 3 STEERING WHEEL LOWER COVER
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
8. CHECK SRS WARNING LIGHT
(See page )
Fuel Sender Open Detected (B1500)
DESCRIPTION
This DTC is stored when the combination meter detects a fuel sender gauge malfunction.
DTC Code
DTC Detection Condition
Trouble Area
B1500
IG voltage is 9.5 V or higher and the followin ...
Operation Check
OPERATION CHECK
1. CHECK AUTOMATIC RUNNING BOARD OPERATION
(a) When side auto step switch assembly is "AUTO", the operation and condition
of this control are described below.
Check that the driver side automatic running board operates as follows ...