INSTALLATION
PROCEDURE
1. INSTALL SEAT HEATER SWITCH
(a) Attach the 4 claws to install the 2 switches.
(b) Connect the 2 connectors.
2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
3. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET CLUTCH ASSEMBLY
(a) Check the magnet clutch operation.
(1) Confirm that the magnet clutch hub and magnet clutch rotor lock when the
positive (+) lead of the battery is connected to terminal 3 of the magnet clutch, ...
Short in Driver Side Squib Circuit (B1800/51-B1803/51)
DESCRIPTION
The driver side squib circuit consists of the center airbag sensor,
spiral cable and steering pad.
The circuit instructs the SRS to deploy when deployment conditions are
met.
These DTCs are stored when a malfunction is detec ...