INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(a) Remove any dust and oil from the differential carrier assembly and the contact surfaces of the axle housing.
(b) Install a new gasket and the differential carrier assembly with the 11 nuts and 11 washers.
Torque:
52 N·m {530 kgf·cm, 38 ft·lbf}
(c) Connect the differential lock actuator connector.
(d) Connect the rear differential lock actuator breather hose to the differential actuator assembly.
2. INSTALL REAR AXLE SHAFT LH
(a) Install the rear axle shaft LH (See page
).
3. INSTALL REAR AXLE SHAFT RH
HINT:
Use the same procedure described for the LH side.
4. INSTALL PROPELLER SHAFT ASSEMBLY
(a) Install the propeller shaft assembly (See page
).
Installation
INSTALLATION
PROCEDURE
1. INSTALL INSTRUMENT PANEL PASSENGER AIRBAG ASSEMBLY
(a) Attach the 5 hooks (A).
Text in Illustration
*a
Hook A
*b
Hook B
...
Removal
REMOVAL
PROCEDURE
1. REMOVE REAR NO. 1 FLOOR STEP COVER (w/ Rear No. 2 Seat)
2. REMOVE QUARTER SCUFF PLATE RH (w/ Rear No. 2 Seat)
3. REMOVE REAR DOOR SCUFF PLATE RH
4. REMOVE REAR DOOR OPENING TRIM WEATHERSTRIP RH
5. REMOVE OUTER LAP BELT AN ...