INSTALLATION
PROCEDURE
1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(a) Align the matchmarks on the yoke and differential flange.
(b) Install the propeller shaft assembly with the 4 washers, 4 bolts and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
(c) Align the matchmarks on the yoke and transfer flange.
(d) Install the propeller shaft assembly with the 4 washers and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
2. INSTALL FRONT EXHAUST PIPE
(a) Install the front exhaust pipe (See page
).
ReassemblyAdjustment
ADJUSTMENT
PROCEDURE
1. INSPECT PARKING BRAKE PEDAL TRAVEL
(a) Fully depress the parking brake pedal to engage the parking brake.
(b) Depress the pedal again to disengage the parking brake.
(c) Slowly depress the parking brake pedal using the specified fo ...
Side Auto Step LH Stowing Timeout (51-56)
DESCRIPTION
When fully deploying or stowing the automatic running board takes more than 4
seconds, or when the side auto step motor hall sensor pulse signal exceeds the maximum
pulse count, the side auto step ECU halts the operation of the automatic runni ...