Toyota 4Runner manuals

Toyota 4Runner: Installation

INSTALLATION

PROCEDURE

1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY

(a) Align the matchmarks on the yoke and differential flange.

(b) Install the propeller shaft assembly with the 4 washers, 4 bolts and 4 nuts.

Torque:

88 N·m {899 kgf·cm, 65 ft·lbf}

(c) Align the matchmarks on the yoke and transfer flange.

(d) Install the propeller shaft assembly with the 4 washers and 4 nuts.

Torque:

88 N·m {899 kgf·cm, 65 ft·lbf}

2. INSTALL FRONT EXHAUST PIPE

(a) Install the front exhaust pipe (See page
).

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL FRONT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING HINT: Use the same procedure for all propeller shaft universal joint spider bearing. (a) Apply MP g ...

Propeller Shaft Assembly(for 2wd)
...

Other materials about Toyota 4Runner:

Terminals Of Ecu
TERMINALS OF ECU 1. TERMINALS OF ECU Text in Illustration *a Component without harness connected (Skid Control ECU) - - Terminal No. (Symbol) Terminal Description ...

Sound Signal Circuit between Navigation Receiver Assembly and Stereo Jack Adapter
DESCRIPTION The No. 1 stereo jack adapter assembly sends the sound signal from an external device to the navigation receiver assembly via this circuit. The sound signal that has been sent is amplified by the stereo component amplifier assembly, and then ...

© 2016-2025 | www.to4runner.net

0.0085