INSTALLATION
PROCEDURE
1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(a) Align the matchmarks on the yoke and differential flange.
(b) Install the propeller shaft assembly with the 4 washers, 4 bolts and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
(c) Align the matchmarks on the yoke and transfer flange.
(d) Install the propeller shaft assembly with the 4 washers and 4 nuts.
Torque:
88 N·m {899 kgf·cm, 65 ft·lbf}
2. INSTALL FRONT EXHAUST PIPE
(a) Install the front exhaust pipe (See page
).
ReassemblyPressure Control Solenoid "B" Electrical (Shift Solenoid Valve SL2) (P0778)
DESCRIPTION
Shifting from 1st to 5th is performed in combination with the ON and OFF operation
of the shift solenoid valves SL1, SL2, S1, S2 and SR, which are controlled by the
ECM. If an open or short circuit occurs in one of the shift solenoid valves, t ...
USB Media Malfunction (B1585)
DESCRIPTION
This DTC is stored when a malfunction occurs in a connected device.
DTC No.
DTC Detection Condition
Trouble Area
B1585
When one of the conditions below is met:
A non mass- ...