Disposal
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL STEREO COMPONENT TUNER ASSEMBLY
(a) Connect the 6 connectors to the radio and display receiver assembly or navigation
receiver assembly and stereo component tuner assembly.
HINT:
Connect the connectors with white tape t ...
Replacement
REPLACEMENT
PROCEDURE
1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM
(a) Start the engine.
(b) Turn the A/C switch on.
(c) Operate the cooler compressor while the engine speed is approximately 1000
rpm for 5 to 6 minutes to circulate the refrigerant a ...