INSTALLATION
PROCEDURE
1. INSTALL POWER OUTLET SOCKET COVER
(a) Attach the 2 claws to install the socket cover.
2. INSTALL POWER OUTLET SOCKET ASSEMBLY
(a) Attach the claw to install the power outlet socket assembly.
3. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Climate Control Seat System)
4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/ Climate Control Seat System)
5. INSTALL NO. 2 CONSOLE BOX RETAINER
6. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
9. INSTALL HEATER CONTROL ASSEMBLY
10. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
11. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
System Description
SYSTEM DESCRIPTION
1. POWER WINDOW CONTROL SYSTEM DESCRIPTION
(a) The power window control system controls the power window operation using
the power window regulator motors. The main controls of this system are the multiplex
network master switch assemb ...
Reassembly
REASSEMBLY
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
When installing the pad, heat the moulding surface using a heat light.
Standard:
I ...