INSTALLATION
PROCEDURE
1. INSTALL POWER OUTLET SOCKET COVER
(a) Attach the 2 claws to install the socket cover.
2. INSTALL POWER OUTLET SOCKET ASSEMBLY
(a) Attach the claw to install the power outlet socket assembly.
3. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Climate Control Seat System)
4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/ Climate Control Seat System)
5. INSTALL NO. 2 CONSOLE BOX RETAINER
6. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
9. INSTALL HEATER CONTROL ASSEMBLY
10. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
11. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Power Supply Voltage Malfunction (C1882/82)
DESCRIPTION
The stabilizer control ECU recognizes the ignition switch ON signal based on
the voltage input to the IG terminal.
DTC Code
DTC Detection Condition
Trouble Area
C1882/82
The IG termin ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. READ DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very usefu ...