PARTS LOCATION
ILLUSTRATION
ILLUSTRATION
Precaution
System DiagramRegistration
REGISTRATION
PROCEDURE
1. BEFORE REGISTRATION
NOTICE:
The transmitter ID is written on the tire pressure warning valve and transmitter.
It is not possible to read the transmitter ID after installing the tire onto the
wheel. Therefore, make a note of th ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator bracket to the generator with the bolt.
Torque:
20 N·m {204 kgf·cm, 15 ft·lbf}
(b) Install the generator with the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(c ...