DESCRIPTION
The signal check circuit detects trouble in the sensor or switch signal which cannot be detected by the DTC check.
Connecting terminals TS and CG of the DLC3 starts the check.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
When replacing the master cylinder solenoid, perform calibration (See page
).
PROCEDURE
|
1. |
CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - DLC3) |
(a) Turn the ignition switch off.
(b) Disconnect the A6 skid control ECU connector.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
A6-24 (TS) - F13-12 (TS) |
Always |
Below 1 Ω |
| NG | |
REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
2. |
CHECK HARNESS AND CONNECTOR (DLC3 - BODY GROUND) |
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
F13-4 (CG) - Body ground |
Always |
Below 1 Ω |
| NG | |
REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
3. |
CHECK HARNESS AND CONNECTOR (DLC3 - BODY GROUND) |
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
F13-12 (TS) - Body ground |
Always |
10 kΩ or higher |
| OK | |
REPLACE MASTER CYLINDER SOLENOID |
| NG | |
REPAIR OR REPLACE HARNESS OR CONNECTOR |
TC and CG Terminal Circuit
Vsc Off SwitchRemoval
REMOVAL
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
When removing the window frame moulding, heat the vehicle body and window
frame moulding using a heat li ...
Installation
INSTALLATION
PROCEDURE
1. TEMPORARILY INSTALL FRONT STABILIZER LINK ASSEMBLY RH
(a) Temporarily install the front stabilizer link assembly with the bolt.
HINT:
Make sure that the identification mark on the front stabilizer link assembly
...