INSTALLATION
PROCEDURE
1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(a) Install a new gasket and the differential carrier assembly with the 10 nuts and 10 washers.
Torque:
52 N·m {530 kgf·cm, 38 ft·lbf}
2. INSTALL REAR AXLE SHAFT LH
(a) Install the rear axle shaft LH (See page
).
3. INSTALL REAR AXLE SHAFT RH
HINT:
Use the same procedure described for the LH side.
4. INSTALL PROPELLER SHAFT ASSEMBLY
(a) Install the propeller shaft assembly (See page
).
Moon roof
Use the overhead switches to open and close the moon roof and tilt it up
and down.
Opening and closing
1. Opens the moon roof* The moon roof stops slightly before the fully open
position to reduce wind noise.
Press the switch again to fully open the m ...
VSC OFF Indicator Light does not Come ON
DESCRIPTION
Refer to VSC OFF Indicator Light Remains ON (See page
).
WIRING DIAGRAM
Refer to VSC OFF Indicator Light Remains ON (See page
).
CAUTION / NOTICE / HINT
NOTICE:
When replacing the master cylinder solenoid, perform calibration (See page
...